Scrap Material | Average Price | High Price | Low Price | Price Unit | Updated |
---|---|---|---|---|---|
#2 Insulated Copper Wire 50% Recovery | 1 | 1 | 1 | USD/LB | 12/20/2023 |
#2 Copper Tubing | 3 | 3 | 3 | USD/LB | 12/20/2023 |
Steel Base Carburetors | 0.06 | 0.06 | 0.06 | USD/LB | 12/20/2023 |
Aluminum Water Pumps | 0.06 | 0.06 | 0.06 | USD/LB | 12/20/2023 |
Aluminum Water Pumps Large | 0.12 | 0.12 | 0.12 | USD/LB | 12/20/2023 |
Aluminum Pistons Clean | 0.5 | 0.5 | 0.5 | USD/LB | 12/20/2023 |
Aluminum Piston W/Rod (Dirty) | 0.07 | 0.07 | 0.07 | USD/LB | 12/20/2023 |
Low Grade ICW | 0.6 | 0.6 | 0.6 | USD/LB | 12/20/2023 |
Insulated Copper Wire 65% recovery | 2 | 2 | 2 | USD/LB | 12/20/2023 |
Heater Cores | 1 | 1 | 1 | USD/LB | 12/20/2023 |
Harness Wire | 1 | 1 | 1 | USD/LB | 12/20/2023 |
Electric Motors | 0.25 | 0.25 | 0.25 | USD/LB | 12/20/2023 |
Bare Bright Copper | 3.1 | 3.1 | 3.1 | USD/LB | 12/20/2023 |
Aluminum Car Rims | 1 | 1 | 1 | USD/LB | 12/20/2023 |
#2 Copper | 3 | 3 | 3 | USD/LB | 12/20/2023 |
#1 Copper | 3 | 3 | 3 | USD/LB | 12/20/2023 |
Yellow Brass Shells | 1.7 | 1.7 | 1.7 | USD/LB | 12/20/2023 |
Red Brass | 2 | 2 | 2 | USD/LB | 12/20/2023 |
Hard Brass | 2.7 | 2.7 | 2.7 | USD/LB | 12/20/2023 |
Brass Radiator | 1.7 | 1.7 | 1.7 | USD/LB | 12/20/2023 |
Brass Radiator /Fe | 1.1 | 1.1 | 1.1 | USD/LB | 12/20/2023 |
Chrome Wheels | 0.6 | 0.6 | 0.6 | USD/LB | 12/20/2023 |
Aluminum Sheet | 0.5 | 0.5 | 0.5 | USD/LB | 12/20/2023 |
Aluminum Extrusion | 0.7 | 0.7 | 0.7 | USD/LB | 12/20/2023 |
Aluminum Cast | 0.5 | 0.5 | 0.5 | USD/LB | 12/20/2023 |
Aluminum Car Wheels Dirty | 0.95 | 0.95 | 0.95 | USD/LB | 12/20/2023 |
Steel Block Engines | 0.06 | 0.06 | 0.06 | USD/LB | 5/22/2023 |