Yard Address:
4211 Auto Road S.E.Yard Address:
1265 Sam Toy AvenueYard Address:
131 Mish-aw RoadYard Address:
4586 Glenwood DrYard Address:
157 Esperanza DriveYard Address:
PO Box 221Yard Address:
Victoria Yard (Product Sales & Drop-off)Yard Address:
823 Cornell AveYard Address:
4850 Weyerhauser RdYard Address:
2331 Fleetwood AveYard Address:
Box 3092Yard Address:
6776 Wendonna PlYard Address:
603-3660 Vanness AvenueYard Address:
34313 Farmer RoadYard Address:
304 Kelly roadYard Address:
8 Day Ave, PO BOX 20079There are different types of construction waste. The classification is done based on the type of material:
Recycling concrete waste from a demolition involves several steps. The concrete waste is fed in to the crusher machine which breaks down in to smaller pieces. Special industrial equipments like excavator with hammers are used to breakup bigger pieces. Further, the concrete is examined to remove any specific impurities and sorted in to large and small aggregate particles.
With higher focus on the environment hygiene and safety, it is extremely important for the construction industry to give primacy to the aspect of waste reduction. Here are some top ways to minimize construction waste.
Construction and demolition sites often tend to generate different types of waste. Some of the common types of construction waste that can be reused include: