Material
Location

Current Scrap Metal Prices in Everett, Massachusetts

The prices listed below are paid by the scrap yards in Everett.
Aluminum ScrapCity Average
Updated on 4/25/2025
0.68 USD/LB
Brass ScrapCity Average
Updated on 4/25/2025
1.75 USD/LB
Copper ScrapCity Average
Updated on 4/25/2025
2.36 USD/LB
Scrap MaterialAverage PriceHigh PriceLow PricePrice UnitUpdated
Al/Cu Radiators1.701.701.70USD/LB4/25/2025
New Aluminum0.550.550.55USD/LB4/25/2025
Aluminum Transmissions0.050.050.05USD/LB4/25/2025
Brass Clean2.002.002.00USD/LB4/25/2025
Extruded Aluminum0.700.700.70USD/LB4/25/2025
Romex 65% Copper Wire1.801.801.80USD/LB4/25/2025
Electric Motors0.200.200.20USD/LB4/25/2025
Stainless Steel0.420.420.42USD/LB4/25/2025
Aluminum MLC Clips0.550.550.55USD/LB4/25/2025
Insulated Copper Wire 80% Recovery2.302.302.30USD/LB4/25/2025
#1 Insulated Copper Wire 75% Recovery2.102.102.10USD/LB4/25/2025
Bare Bright Copper3.403.403.40USD/LB4/25/2025
#3 Copper2.802.802.80USD/LB4/25/2025
Steel BX0.780.780.78USD/LB4/25/2025
Lead Batteries0.130.130.13USD/LB4/25/2025
Brass Radiator /Fe1.251.251.25USD/LB4/25/2025
Aluminum0.600.600.60USD/LB4/25/2025
Aluminum Siding0.550.550.55USD/LB4/25/2025
Irony Aluminum0.050.050.05USD/LB4/25/2025
Aluminum Cast0.550.550.55USD/LB4/25/2025
Brass Radiator1.501.501.50USD/LB4/25/2025
Yellow Brass2.252.252.25USD/LB4/25/2025
Aluminum Car Rims0.700.700.70USD/LB4/25/2025
#1 Copper3.253.253.25USD/LB4/25/2025
#2 Copper3.053.053.05USD/LB4/25/2025
Lead0.650.650.65USD/LB4/25/2025
Aluminum BX (MC)0.800.800.80USD/LB4/25/2025
Al/Cu Radiators /Fe1.401.401.40USD/LB4/25/2025
P&S Unprepared130.00130.00130.00USD/GT1/23/2025
Drums and Rotors150.00150.00150.00USD/GT1/23/2025
Light w. Heavy115.00115.00115.00USD/GT1/23/2025
Heavy w. Light120.00120.00120.00USD/GT1/23/2025
Steel Turnings85.0085.0085.00USD/GT1/23/2025
Cast Iron150.00150.00150.00USD/GT1/23/2025
Light Iron110.00110.00110.00USD/GT1/23/2025
Torching Unprepared115.00115.00115.00USD/GT1/23/2025
#2 HMS Unprepared110.00110.00110.00USD/GT1/23/2025
#1 HMS Unprepared120.00120.00120.00USD/GT1/23/2025
P&S160.00160.00160.00USD/GT1/23/2025
#2 HMS Prepared140.00140.00140.00USD/GT1/23/2025
#1 HMS Prepared150.00150.00150.00USD/GT1/23/2025
Busheling180.00180.00180.00USD/GT1/23/2025
Insulated Copper Wire 50% Recovery1.301.301.30USD/LB6/20/2024
Cast Iron175.00175.00175.00USD/GT1/05/2023
#1 HMS Prepared Iron170.00170.00170.00USD/GT10/17/2022
#1 Busheling225.00225.00225.00USD/GT10/17/2022
Busheling300.00300.00300.00USD/GT9/05/2022
Cast Iron170.00170.00170.00USD/GT9/05/2022
Brass Dirty2.102.102.10USD/LB6/20/2022
Yellow Brass Dirty 80% Recovery3.003.003.00USD/LB4/20/2022
Aluminum Extrusion0.650.650.65USD/LB12/20/2021
304 Stainless Steel0.350.350.35USD/LB11/18/2020
316 Stainless Steel0.400.400.40USD/LB11/18/2020
Shredded0.100.100.10USD/LB9/02/2020
Aluminum Wheels Clean0.450.450.45USD/LB4/10/2020

Scrap Yards in Everett