Material
Location

Current Scrap Metal Prices in Everett, Massachusetts

The prices listed below are paid by the scrap yards in Everett.
Aluminum ScrapCity Average
Updated on 8/16/2024
0.69 USD/LB
Brass ScrapCity Average
Updated on 8/16/2024
1.80 USD/LB
Copper ScrapCity Average
Updated on 8/16/2024
2.37 USD/LB
Scrap MaterialAverage PriceHigh PriceLow PricePrice UnitUpdated
Steel Turnings85.0085.0085.00USD/GT8/16/2024
Insulated Copper Wire 80% Recovery2.452.452.45USD/LB8/16/2024
Aluminum MLC Clips0.550.550.55USD/LB8/16/2024
Stainless Steel0.420.420.42USD/LB8/16/2024
#1 HMS Prepared190.00190.00190.00USD/GT8/16/2024
P&S200.00200.00200.00USD/GT8/16/2024
P&S Unprepared180.00180.00180.00USD/GT8/16/2024
#1 HMS Unprepared160.00160.00160.00USD/GT8/16/2024
#2 HMS Unprepared150.00150.00150.00USD/GT8/16/2024
Torching Unprepared115.00115.00115.00USD/GT8/16/2024
Light Iron150.00150.00150.00USD/GT8/16/2024
Al/Cu Radiators1.701.701.70USD/LB8/16/2024
Electric Motors0.200.200.20USD/LB8/16/2024
Heavy w. Light165.00165.00165.00USD/GT8/16/2024
Light w. Heavy155.00155.00155.00USD/GT8/16/2024
Romex 65% Copper Wire1.851.851.85USD/LB8/16/2024
Drums and Rotors225.00225.00225.00USD/GT8/16/2024
Extruded Aluminum0.700.700.70USD/LB8/16/2024
Brass Clean2.202.202.20USD/LB8/16/2024
Cast Iron190.00190.00190.00USD/GT8/16/2024
Busheling210.00210.00210.00USD/GT8/16/2024
Aluminum Transmissions0.050.050.05USD/LB8/16/2024
#1 Copper3.253.253.25USD/LB8/16/2024
Al/Cu Radiators /Fe1.401.401.40USD/LB8/16/2024
Aluminum BX (MC)0.800.800.80USD/LB8/16/2024
Aluminum Car Rims0.700.700.70USD/LB8/16/2024
Aluminum Cast0.550.550.55USD/LB8/16/2024
Aluminum Siding0.550.550.55USD/LB8/16/2024
Irony Aluminum0.050.050.05USD/LB8/16/2024
Brass Radiator /Fe1.251.251.25USD/LB8/16/2024
Brass Radiator1.501.501.50USD/LB8/16/2024
Yellow Brass2.252.252.25USD/LB8/16/2024
#1 Insulated Copper Wire 75% Recovery2.102.102.10USD/LB8/16/2024
#2 Copper2.952.952.95USD/LB8/16/2024
Aluminum0.550.550.55USD/LB8/16/2024
Lead Batteries0.130.130.13USD/LB8/16/2024
Bare Bright Copper3.353.353.35USD/LB8/16/2024
Steel BX0.450.450.45USD/LB8/16/2024
Lead0.650.650.65USD/LB8/16/2024
#3 Copper2.852.852.85USD/LB8/16/2024
Insulated Copper Wire 50% Recovery1.301.301.30USD/LB6/20/2024
#2 HMS Prepared205.00205.00205.00USD/GT3/20/2024
Cast Iron175.00175.00175.00USD/GT1/05/2023
#1 Busheling225.00225.00225.00USD/GT10/17/2022
#1 HMS Prepared Iron170.00170.00170.00USD/GT10/17/2022
Busheling300.00300.00300.00USD/GT9/05/2022
Cast Iron170.00170.00170.00USD/GT9/05/2022
Brass Dirty2.102.102.10USD/LB6/20/2022
Yellow Brass Dirty 80% Recovery3.003.003.00USD/LB4/20/2022
Aluminum Extrusion0.650.650.65USD/LB12/20/2021
304 Stainless Steel0.350.350.35USD/LB11/18/2020
316 Stainless Steel0.400.400.40USD/LB11/18/2020
Shredded0.100.100.10USD/LB9/02/2020
Aluminum Wheels Clean0.450.450.45USD/LB4/10/2020

Scrap Yards in Everett